Repository check-in forced termination..

Feb 27, 2017 at 02:35 PM

16

avatar image
Former Member

While large model are checked in via Proxy, if a user terminate Powerdesigner, what happens in proxy server ?

Does proxy server rollback immediately?

If not, still check in the model ?

I was forced to close Powerdesigner while checked in.

A DBA tell me the session of proxy server is working in DBMS (Oracle 11g).

When the session is closed in DBMS ?

TIA