When we select parameter in selection flow step - System fetch less materials
previous costing run was done for 16159 material but in current month Costing run is fetching less 3842 materials
in selection same parameters were selected for both costing run
plz find the below screenshot attached
1. costing run - 5.8.2023 (16159 materials)
costing run on 5.8.23 but cost run was not released due to error

error log for above screen

2. costing run - 5.8.2023 (3842 materials)

Please provide Solution