Dear PP Experts,
I'm facing the problem with batch determination function that suggested batch allocated for previous component line.
order structure is below;
Order 100001 produce FG 10 PC.
Stock situation
RM1 / Batch A / Quantity 10
RM1 / Batch B / Quantity 10
After batch determined for Item 10 and 20 system proposed
Item10 with Batch A
Also Item20 with Batch A
Can I setup to get the result like?
Item10 with Batch A
Also Item20 with Batch B
So far, I have to determine item10 first then save. After that system can propose batch B.
Is it possible to cumulate commit quantity to calculate the next line with same component code?



