Skip to Content
0
Sep 07, 2023 at 03:47 AM

Configuration Availability Check for Production Planning Module

44 Views

Hi

I have some questions about the scope of check in availability check, as follows:

1. How to configure for ATP not reading Sloc and Subcont stock, I checked Without Storage Location and Without Subcontracting but the system displays an error message as follows

image.png

2. When running Material ATP in CO02, I want the commit quantity to be set to the minimum qty requirement.

image.png

Attachments

image.png (56.6 kB)
image.png (4.8 kB)