Hi
I have some questions about the scope of check in availability check, as follows:
1. How to configure for ATP not reading Sloc and Subcont stock, I checked Without Storage Location and Without Subcontracting but the system displays an error message as follows

2. When running Material ATP in CO02, I want the commit quantity to be set to the minimum qty requirement.
