Dear Sir,
Can we run costing if material is having price control all maetrial type (FG,SFG,RM,PM)
If yes ... can u guide the configuration and procedure followed for costing run
1. if costing run is done for FG - which price will update
2. what are the configuration steps for costing run on price control v is maitained for all material
3 and there procedure