Minimum batch size on a work order

57 Views

Hello to everyone,

I will try to be as accurate and short as possible, but please excuse me if I fail in doing so.

Let's say I have a work order for material X for 3 000 kg, in MRP 1 've defined minimum and maximum batch size of 600 to 6 000 kg and ideal case scenario where the number of batches in the lot will be 5 (3000/600=5).

In the case when I have 3 150 kg the number of batches will be 6! This is the math (3150/600 = 5,25 -> okay then lets do 525; 3150/525 = 6). How is that possible if I've predefined minimum batch size as 600 kg in MRP1?

Production version in C223 is set on 603 kg, 600 kg + loss.

Is there any setting that I'm missing?

Thank you in advance