Hi,
We have a process in which we received material from the vendor and perform sampling etc on received material.
inbound delivery > inspection lot created > for sampling we use production orders etc (With no postings).
Is it possible to assign a production order (Manually Created) with the inbound inspection lot to cover the cost of operations in the production order?