Dear support team,
Next stage of quality level is not updated as I expected.
Inspection plan has two material codes, A and B.
Material A and B use same inspection plan.
Modification Rule is set.
Quality Level: Next Stage is "1" in both material A and B.
Create process order with material A and inspection lot was created.
Quality Level: Next Stage of material A is updated to "2" as I expected.
Although these two materials have same inspection plan, Next Stage of material B is still "1"
I think next stage is updated every material, plant, group, and group counter.
Is it possible to update next stage every group and group counter?
Best regards,