Dear Experts!
I want to transfer the configurable BOM to GTS by following the steps linked below. I have created a sales order with configurable materials, but have not found a new entry in this place: in the feeder system, choose on the tab page Documents SAP Risk Management Preference: Display Worklist of Configurable Materials.
Preference Determination for Configurable Bills of Material | SAP Help Portal
How can I deal with this issue?
Thanks!