Hello,
I am running SAP IBP TS Optimizer in daily buckets, in our production process we have yields at certain manufacturing stages. I observed that when I run the Optimizer without applying the yield it does not prebuild and creates the production receipts correctly on the demand date. But when I apply yield the Optimizer starts prebuilding and generates the production receipts immediately. The behavior resembles a push scenario, even though I have relatively a low inventory holding cost rate. In our scenario, we do not have any capacity constraints which will force it to pre-build.
I can share the cost model setup if someone wants to take a closer look at it.
Thanks,
Amit