Dear Sir,

I have executed CK11N and One Raw material is showing calculator sign (Costing). And you know that Raw material should not have costing symbol in the cost estimate. I have checked the raw material and it was not selected "Do Not Cost" in the Material master costing tab. I have changed and selected "Do Not Cost" in the material master. But costing symbol is still showing in the cost estimate. How can I change costing symbol to Raw material symbol in the cost estimate.