Skip to Content
0
Aug 23, 2023 at 03:33 AM

overhead in Costing

124 Views

1. what is diffrence between Actual overhead rate and planned overhead rate and commitement overhead rate. and which one is used as standard pratice

2.what is dependence in overhead rate

3.when we assign overhead rate, at the time of calculation base when we give cost element group, overhead is considered for calculation but when we assign from cost element and To cost element the overhead is not cosidered. Why?

4. What is Qty structure date And Valuation date under date control in costing variant (OKKN)

5. What is Transfer control in costing variant

6. What is refence variant in costing variant

7 what is Qty structre control in costing variant

Please it would be greatful Ans with Example is given