Hi All,
I have a scenario where I need to book HU material to a Production Order, however the material is not part of the BoM. This is an adhoc requirement to save waste so cannot be set as part of the BoM.
I have looked at MB1A however this cannot assign HU stock to the prod order.
Is there a way of doing this?
Thanks in advance.