Skip to Content
0
Aug 02, 2023 at 01:10 AM

Can I remove default scope item Event-Based Production Cost Posting (3F0)?

50 Views Last edit Aug 02, 2023 at 02:05 AM 2 rev

Hi

I have a question.

I want to remove default scope item Event-Based Production Cost Posting (3F0) and deploy Period-End Closing - Plant (BEI). Is it possible to remove default scope item?

And If I can not remove Event-Based Production Cost Posting (3F0) scope item. I think Period-End Closing - Plant (BEI) is not available scope item. it that right?

thanks. regards.