Hi Guys!
Trying to generate BITs from Allowance, I am facing the following error:

I seted de Charged Item Class at the Output tab, that is the same seted at Output tab of the Charge Plan

The Allowance is mapped at the Billable Item Mapping

What would be missing to have the BIT?