Hi All,
Below is the child job which getting failed, this belongs to a parent job. Below is the error occured and my thought is to increase the waiting time for this job. But I have searched in Mgmt Console as well as in Designer, but I haven't found any option to do so.
Can anyone please suggest here to resolve the issue.
" Maximum waiting time of 7.200 seconds exceeded".
