Hi,
I find that the Total Actl Cost and total plan cost of Production Order is error in APP order-Event-Based.
1.Define Parameters
1.1Through SSCUI 102608 , define the evaluation variant check and evaluation variant configuration details for each factory.
I have change the value to 1-Plan price for the period.

1.2 In APP Manage cost rates-Plan, define Fixed Rate of the cost center 43000005 activity type ACT200, I maintain the value, the Fixed Rate is 60 , the Variable rate is 60.

1.3 I create Material Cost Estimate , quantity is 0.5 H. I find the Total Value of cost center 43000005 activity type ACT200 is 30 ,the Fixed Value is 15 . I think It is error .
In APP Manage cost rates-Plan, the cost center 43000005 activity type ACT200, I maintain the value, the Fixed Rate is 60 , the Variable rate is 60/1 H . So the correct value should be: the Fixed Value is 60 , the total value is 90.

1.4 I create a Production Order
1.5 I confirm this Production Order . In Confirmation , the activity type ACT200 is 5H.
1.6 In APP order-Event-Based, I find that the Total Actl Cost and total plan cost of Production Order is error .
The Total Plan Cost of Cost Center 43000005 Activity Type ACT200 is 300 CNY ,It should be 360, As the Fixed Rate and the Variable Rate of Cost Center 43000005 Activity Type ACT200 is 60 CNY/1H , and the Machine activities is 5H .
The Total Actl Cost of Cost Center 43000005 Activity Type ACT200 is 600 CNY ,It should be 360,As the Fixed Rate and the Variable Rate of Cost Center 43000005 Activity Type ACT200 is 60 CNY/1H , and the Machine activities is 5H .