Hello everyone,
we use QM with EWM together. So to free the goods you have to accept the inspection lot. Afterwards you also have tp accept the inspection document in EWM. Is there a possiblity to combine those two steps so the inspection document in EWM is accepted once the inspection lot in ERP is accepted?
Thanks for your help!