Hi Gurus,
We are attempting to setup block planning in ePPDS for discrete material i.e.,class 300 & 023 not involved.
Steps performed :
- 'MATERIAL_A' and work center 'MAIN_LINE' created with 'Advanced Planning' check
- BOM,routing and production version created
- Class type 019,018,400 with Org.area 'A' created in O1CL->MARA
- Created characteristic 'CHAR_A' with value 'A' and assigned org.area 'A'
- 'CLASS_19' class of type 019 created...characteristic 'CHAR_A' with org.area 'A' assigned
- 'CLASS_18' class of type 018 created...characteristic 'CHAR_A' with org.area 'A' assigned
- 'CLASS_19' assigned to 'MAIN_LINE' work center (CR02)
- 'CLASS_18' assigned to routing header for 'MATERIAL_A' (CA02)
- CIF model with :
characteristic 'CHAR_A' as additional characteristic
Org.area 'A'
Class type '19'
CFM1 & CFM2 executed for the model.
Steps not performed yet :
- Block basis definition setup
- Sending 'MATERIAL_A' PDS
Questions :
1.Is the above sequence of steps performed OK ?
2.Since we need to assign 'CDP class' in the resource master for 'MAIN_LINE',do we create class 400 manually ?
No class values are currently available (F4) in 'CDP class' field of the resource master.
Do I need to activate 'CDP Schema' under 'Define Configuration Schema' ?
NOTE : BAdI CUSLNTRTO_ADDIN with method USE_OPERATION_CLASSIFICATION with X for the parameter EV_TRUE is implemented.