Hi Gurus,

We are attempting to setup block planning in ePPDS for discrete material i.e.,class 300 & 023 not involved.

Steps performed :

- 'MATERIAL_A' and work center 'MAIN_LINE' created with 'Advanced Planning' check

- BOM,routing and production version created

- Class type 019,018,400 with Org.area 'A' created in O1CL->MARA

- Created characteristic 'CHAR_A' with value 'A' and assigned org.area 'A'

- 'CLASS_19' class of type 019 created...characteristic 'CHAR_A' with org.area 'A' assigned

- 'CLASS_18' class of type 018 created...characteristic 'CHAR_A' with org.area 'A' assigned

- 'CLASS_19' assigned to 'MAIN_LINE' work center (CR02)

- 'CLASS_18' assigned to routing header for 'MATERIAL_A' (CA02)

- CIF model with :

characteristic 'CHAR_A' as additional characteristic

Org.area 'A'

Class type '19'

CFM1 & CFM2 executed for the model.

Steps not performed yet :

- Block basis definition setup

- Sending 'MATERIAL_A' PDS

Questions :

1.Is the above sequence of steps performed OK ?

2.Since we need to assign 'CDP class' in the resource master for 'MAIN_LINE',do we create class 400 manually ?

No class values are currently available (F4) in 'CDP class' field of the resource master.
Do I need to activate 'CDP Schema' under 'Define Configuration Schema' ?

NOTE : BAdI CUSLNTRTO_ADDIN with method USE_OPERATION_CLASSIFICATION with X for the parameter EV_TRUE is implemented.