Dear SAP experts,
I got a strange issue on the product view of a material whose material master in the location is as in the following figure

The issue happens when a Sales order comes on the same day of a planned individ. requirement: in product view it is allocated on a forecast of the previous month, while I was expecting it should be allocated on the forecast of the same day.
Also, in MD04 it is allocated correctly (sales order with req. avail. date on 6/3/2023 consumes the forecast planned on the 6/3/2023). How is that possibile?
Many thanks in advance for your time