the POC Calculation formula can be modified or re-designed ??

24 Views

Our client has one request for ITEM SOCPE 4I9:

With cost-based POC method the system calculates recognized revenue on the basis of the actual costs.

In the current SAP start system: POC = actual costs of an event-based cost posting / planned costs, which does not fit the business requirement of AAF.

our client would like to check whether the POC Calculation formula can be modified or re-designed.