Dear Experts,
We are using traditional LE-WM and production integration for material issue is setup without outboud delivery. Raw material storage location (RM01) is HU managed and assigned to warehouse PH1. There is single batch single HU setup and multiple materials/batches are not packed in one HU.
When production order is released, a picklist is created for required quantity using which materials are picked from RM01 and placed in PS01. At prodcution order release, TR is generated for 319 movement type.
Our requirement is to pick full HU (complete quantity) and place it in PSA irrespective of the quantity demand in the production order. Also source HU has to be proposed as detination HU. For ex: if there is a demand for 250 pcs and HU has 1000 pcs then complete HU qty of 1000 to be transferred to PSA bin instead of 250.
In "stock removal control" in picking storage type "HU picking control" is marked as "'1' Propose source HU as destination HU". Also "Full stk rmvl reqmt act." is active.
Have tried different staging indicators in control cycle (LPK1, LPK2) but still its not achieved.
While creating TO from TR, only required quantity is picked and if, at TO confirmation complete HU quantity is inserted, source HU is not accepted as destination HU. Below error is thrown by the system.
"Dest.handling same as source handling unit only allowed for HU takeover
Message no. L3893"
Kindly help