Hello Experts,
we are managing SD sched agreement. The material has an alternative UoM, base is KG, alternative is M(eter). For the material, the 'product unit'management is active, that is, every batch has its own conversion factor.
The SchedAgr item is managed in M. The deliveries are created in M, and the picking made in M. The batches picked have their own weight in Kg, and then the total qty in KG of the delivery item is the sum of the weight of every batch picked in front of the delivery. The good issue is correctly posted using the base UoM 'Kg'.
ISSUE: in the SchedAgr item data, delivery schedule details, if we check the list of deliveries from the standard function, the quantity displayed (in alternative UoM 'M') of each delivery is DIFFERENT from the one contained in the delivery item itself. In fact, the quantity of each one is calculated by the system converting the quantity picked in each delivery item in base UoM, KG, in the alternative UoM of the SchedAgr item 'M', using the standard conversion factor, and not the single batches ones.
The final result is that the 'Cumulative issued quantity' and 'Cumulative delivered quantity' fields are wrong!

The requirement is to have the real delivery item quantity also in the SchedAgr.
Thanks a lot.