Dear Experts,
I need to upload 2nd level WBS element to the existing project. according to my program logic, the new WBS is assigned as 1st level element and updated in the bottom line of the structure.
Needs to update WBS element FM21AP220001552007640015 to under the 2nd element of FM21AP22000155.
( Pls ref 2nd image ).
Pls advise me, if I am doing any incorrect table updates.
- WBS updated incorrect position with existing logic

- Required position to update

Below are the filled internal tables for BAPI_PROJECT_MAINTAIN.

- it_projmethod

- it_uwbs_element_upd

- it_uwbs_element

- it_wbs_hierarchie_table

Thanks
Pramod