

Dear guru's,
I am busy with configuring the inbound process in EWM and I'm facing some challenges with configuring the WPTs. I want for some specific materials configure the process of doing Unloading>Goods Receipt> Pack>Putaway(final step).
In EWM>CP settings>WT>Define WPT I have setup three WPTs (see attachment v1) for the configuration. But one main thing I don't understand is how the WPTs being processed. For example, I have WPT 9010 for GR( materials are in the GR Zone), where I in wpt 9010 have entered the dest st type/bin and in WPT 2010 I have setup the dest and source st type and bin. But how can EWM automate this? What I mean is, how this overflow from one WPT to the other is working?