Skip to Content
0
Jan 13, 2023 at 06:01 AM

How to assign the process instruction to CRD 05 (Transfer to browser-based PI sheet)

99 Views Last edit Jan 19, 2023 at 01:08 PM 2 rev

Hi Teams,

I am setuping the fresh PI sheet in S4 HANA 2022 system, As I know only 04 brouser based PI sheet only applicable.

I have checked O10C O12C

In standard SAP 05 CRD is not assigned with process instruction catagary.

image.png
When I am trying to add it bellow error is triggering.

image.pngde

In O03C I am trying to add the destination type 4 result bellow error is triggering.

image.png

Could you please let us know is I am missing any settings and please guide me to flow PI sheet configuration.

Best Regards,
Syed Taseer

Attachments

image.png (34.3 kB)
image.png (12.9 kB)
image.png (37.4 kB)