Is possible to set-up in MM02 parameteres to supplier so that combination of material will reach dedicated amount.
For example :
Material A = 6.800kg
Material B = 3.200kg
And planned it on Thursday when combination of LOT isze, needed amount will reach truckl load 24.000 +/- 2.000kg.
3x material A - 3 *6800 + material B - 1 x 3200 = 23.600kg
Is it possible ?