We are using inspection points for production order in-process inspection. PQ01 is the control key that contains inspection characteristics and standard trigger point to create rework order. Operation 0040 was confirmed with yield 2 NO via an inspection point. Operation 0060 was initially confirmed with 1 yield and 1 rework. After rework, QC is trying to change the results of this inspection point as yield 2. I expect the yield to change as 2 and rework as 0 for operation 0060. But error message "Up until now only 2 NO confirmed for predecessors 0040 / 0" is obtained. Kindly guide.



Existing inspection point of operation 0060.
QC is changing the inspection point result as show below.