Skip to Content
0
Jan 02, 2023 at 04:46 AM

QE11 - Inspection Point result - Up until now only NO confirmed for predecessors operation

113 Views Last edit Jan 03, 2023 at 04:36 AM 2 rev

We are using inspection points for production order in-process inspection. PQ01 is the control key that contains inspection characteristics and standard trigger point to create rework order. Operation 0040 was confirmed with yield 2 NO via an inspection point. Operation 0060 was initially confirmed with 1 yield and 1 rework. After rework, QC is trying to change the results of this inspection point as yield 2. I expect the yield to change as 2 and rework as 0 for operation 0060. But error message "Up until now only 2 NO confirmed for predecessors 0040 / 0" is obtained. Kindly guide.

image.png

image.png

image.png

Existing inspection point of operation 0060.image.png

QC is changing the inspection point result as show below.image.png

image.png

Attachments

image.png (15.1 kB)
image.png (31.4 kB)
image.png (53.2 kB)
image.png (20.9 kB)
image.png (7.2 kB)
image.png (20.6 kB)