Hello there!
I created a dynamic modification rule in QDR1, to skip at level of characteristics, at the lot creation, where it skips some characteristics (not all) 5 times and analyses 1. Everything went while executing the “happy path”. Then I reject 1 skip characteristic. Then SAP begun a new sequence (as configured on steps level of QDR1 after a rejection) for this characteristic and continued with the original sequence for the other chars.
Is there any way or configuration for the rule to understand that my next stage is analyze "x" full batches with all characteristics, not only iniciate another skip sequence for the char rejected?
Thanks in advance!