Hi Expert,
When we are doing GR for the defective component through 531 (by product) to EWM sloc, then for Defective component inspection lot is getting generated. I deactivate QM Inspection not active for 531 mov type in OMJJ tcode but still lot is getting generated. Is there any config we need to do from EWM side.
Note: In material master only 04 is activated & during 101 system is creating lot which is fine but during 531 for component lot is creating with inspection type 04 and 17 series.
Thanks in advance.