I am doing material cost planning at SAP Analytics Cloud , requiring a material cost estimate.
I would develop an ABAP program that would utilize program "RCS12001" to break multilevel BOM into least levels to calculate FG cost by its raw. In addition, I would require actual activity cost by matnr of FG to add into material cost.
Please guide scenario, from where I could get actual activity cost rate by matnr to add in to material cost.