Skip to Content
0
Dec 02, 2022 at 01:28 PM

MRP not considering Sales Order Requirement in MRP type V1 (Manl Reordr Pont Plning with Extrnl Req)

424 Views

Dear Experts,

I have created a Z-MRP Type as "V1" by copying MRP Type "V1" (Manual Reorder Point Planning with External Req) to cover the External Requirement (Sales Order Requirement) in manual reorder point planning.

1. MRP Type Config FYR,

image.png

2. I am using a Lot Size as H1 (Replenishment to max stock after covering requirements)

image.png

3. The MRP Type, Reorder Point, Lot Size & Maximum Stock Level have been maintained in the Material Master

image.png

4. See the MD04 for current Stock & Requirement list

image.png

The Current Stock is 976,

the Reorder Level is 1000

Maximum Stock Level is 2000

and the Total Sales Order Requirement is 134. So as per my requirement system to generates the Requisition of 2134 to cover the sales order requirement and to update the stock up to the maximum stock level i.e, 2000.

5. Let's run the MRP

image.png

6. See the MRP results below.

image.png

Here the system not considered the sales order requirement of 134 Qty and generated the requisition of 1024 Qty to update the Maximum Stock Level of 2000 as 1024+976=2000.

As per my requirement, the system should have generated the requisition of 2134 Qty to cover the Sales Order Requirement then fill stock of 2000 to max stock level.

Please help me to resolve the above issue.

Thanks and Regards

Mateen

Attachments

image.png (63.6 kB)
image.png (58.2 kB)
image.png (67.6 kB)
image.png (58.4 kB)
image.png (31.8 kB)
image.png (61.8 kB)