Multi resource scheduling heuristics SAP_MULT_SCH error

398 Views

Hello Experts,

We have a business requirement to setup DS scheduling in a PP-PI scenario with multiple production lines(3) for one product. Every line has a separate production version with different production times (3 PDS).Every production version (PDS) has one operation with two phases (setup and produce).

So, we are trying to use the SAP_MULT_SCH heuristic but it's not working as planned. The heuristic is not rescheduling on alternate PDS when we have multiple orders on the same day. It is not returning any error/warning messages in the log.We expect the system to automatically and evenly distribute scheduled orders across the three different production versions

The test records are as follows

一、Master Data:material no Z-FC010;Workcenter T-ZW10,T-ZW11\T-ZW12

image.png

Resource Timesteamid

image.png

PDS

image.png

二、Creat PIR,Run Heuristic SAP_PP_002 Planning of Standard Lots

Commputational ressults

image.png

Heuritic prerequiste

image.png

三、RUN Heuristic SAP_MULT_SCH

image.png

Application error, not allocated to other PDS as expected

image.png