EHS MM integration

Hi All,

I have seen multiple blogs and posts related to EHS and MM integration and gained little knowledge about the same. I am a MM functional consultant and my target is to upload data using recording in DGPREL tcode. While testing some sample data, I am facing the issue "material not assigned to a real substance" when I enter the material number in DGPREL tcode. Below are the configuration steps I did. Let me know if I miss something

1. Highlighted the ''Environmentally Rel'' field in Basicdata2 view for the material I created.

2. Created BOM for my material

3. transferred the BOM - here I got an error which says 'specification assignment not done for the material'

4. I navigated to MM02 additional data option, but couldn't find the specifications tab in it.

Please help.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • May 06 at 12:09 PM

    Hello

    as your knowledge on EHS is limited: you should as some EHS consultant.

    Basicly: You have master data in EHS and you have master data in MM. The integration is done either in "EHS" or in "MM" (you link REAL_SUB to material number). Only if you do this can use the full scope of EHS.

    May be start reading: https://blogs.sap.com/2013/05/07/sap-ehs-management-for-beginners/

    But without any knowledge in EHS: you will not suceed.

    C.B: