Dear Experts,
I am working on the MRP area in SAP HANA. I have to exclude certain storage location while MRP run.
I have created a Storage Location MRP Area FG001 for Plant-A and have assigned 3 Storage Locations (SL1, SL2 & SL3) to this MRP Area.
The MRP Area FG001 is assigned in the material master MRP1 view with MRP Type "ND" to exclude the storage locations assigned to MRP Area FG001 while the MRP.
My doubt is when I run the MRP at the plant level (MD01), whether the system will automatically exclude those storage locations (assigned to FG001), or do I have to run the MRP again at the MRP Area level?
Please guide me in this scenario.
Thanks & regards
Hello 27maheboob
Given your setup you have now two MRP areas:
S/4HANA makes MRP areas obligatory. So MRP doesn't run on plant level directly, but on MRP area level. Therefore if you run MRP on the plant level i.e. MRP area of the plant, storage locations SL1, SL2 & SL3 will be excluded.
Best regards
Dominik Tylczynski
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Dominik,
Thank you very much.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.