We have checked all the mrp views
As per my understanding -Exception message 10 is , system is showing an message to create the sch.lines on that rescheduling date because demands were existing on past date
But requirements were not matching with the rescheduling date in RESB table
Wanted to know why system has updated the rescheduling dates and we are expecting system should take those dates automatically after mrp run
but rescheduling dates with exception message 10 were updated previous sch.line date for every schedule line in MD04
Can anyone guide me here
Thanks in advance.