How to assign multiple work centres for one material ?

Ram_Thakur_9999
Explorer
0 Kudos

How do we assign multiple work centres for one material ?

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Ram

The questions you are asking are really basic production planning questions. Perhaps you should spend some time reading SAP Help and studying the basic features of PP.

Best regards,
Caetano Almeida

Accepted Solutions (0)

Answers (3)

Answers (3)

Caetano
Product and Topic Expert
Product and Topic Expert

Hello

You don't assign a work center directly to the material.

You will create a routing for your material, and this routing will have several operations, each one referring to a different work center.

Regards,
Caetano

Ram_Thakur_9999
Explorer
0 Kudos

Thank You Noted Sir

Narasimha
Active Contributor
0 Kudos

check control key functions. It

has many functions like scheduling, costing etc. Compare PP01 and PP03 and then decide what to use. If auto GR then PP03 .

Ram_Thakur_9999
Explorer
0 Kudos

If Assign Routing with Different Work Centres which control key should be used either PP01 and PP03 Control key for Last Operation.

Which Control key should be assigned for the above activity?

Prasath
Contributor
0 Kudos

Hi Ram,

You can assign the control key depends business requirements, like all operation required confirmation, Milestone confirmation required. auto GR or operation with inspections,

Also if you are assigning control key on Work center as default value that will be automatically copied in routing

Regards

Prasath