Hi Experts
We are currently running a supply optimizer which should use the fixed Adjusted Production of a preceding heuristic run for the production of SFG. However when the optimizer is run, it ignores the values within the adjusted production key figure. the key figure is set and input/output to supply planning. What can be done to ensure the optimizer adheres to the production fix and pushes the SFG into FG where required.

Regards
Ebrahim