cancel
Showing results for 
Search instead for 
Did you mean: 

SNP Location Heuristic Incorrect calculation at the Total level for SOH (projected)

0 Kudos

On a total level, one product and multiple locations, the calculation is not done correctly.

Initial start when you load the product for all locations and do details all on APO location level.

The Result is OK

Do a manual change in either Hub reallocation/Quality recoding/Simulation key figures and ran the location heuristic. The Result is incorrect stock position at the Total level.

Accepted Solutions (0)

Answers (1)

Answers (1)

0 Kudos

Dear Jann,

if key-figure "SOH-projected" should be a time series key-figure then please check the aggregation rule in the planning area customizing on 9AMALO level. If the key-figure should be an auxiliary key-figure defined in the plannung book (not available in planning area) then make sure to run the macro for stock on hand calculation on both detailed and aggregated level. In the macro builder open the macro and chose both detailed and aggregated level.

good luck, Nico