on 05-16-2006 11:43 AM
Hi Mates,
I copied an existing Scorecard which has all the START DATE as 001.2006
I then changed <b>ALL</b> the Elements including the assigned Measures to it`s Objective with Start Data from 001.2006 to START DATE: 001.2005 and END DATE: 999.999
However, when I change the Period Structure of the Scorecard view to 001.2006, it DOES NOT seem to show ALL the measure assignment I had overwritten basically for 001.2005 to 999.9999
In short, the assignment of measure did NOT replace the existing 001.2006 Scorecard START Date.
Basically, the problem is with the END DATE where if I click on the 'Other Period' tab, I receive a POP up showing the VALUE LIST.
How can I EDIT this Value LIST ?
Please advice.
Hi,
Two ideas.
- Also assign the Objective to the Strategy and the Strategy to the Scorecard starting at 001.2005. Otherwise subelements wont be displayed.
- If this doen't work, try to assign an element with the periode 001.2005 to 012.2005. This might add a new entry in the used table instead of changing a current entry.
Regards,
Beat
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
16 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.