cancel
Showing results for 
Search instead for 
Did you mean: 

SAP Multi-Resource Scheduling for S4 HANA 2021

former_member299514
Participant
0 Kudos

Hi All,

Client is currently using the SAP Multiresource Scheduling 8.0 with Optimizer in their current ECC 6.0 system.

They want to upgrade to S4 HANA 2021 (On-Premise). This Add on is shown as compatible with the upgraded SAP system. But the question is which version of SAP MRS should be adopted best with the S4 HANA 2021?

What are the added advantages of the latest version of SAP MRS over the SAP MRS 8.0 in ABAP Server?

Accepted Solutions (0)

Answers (0)