Hello,
I have BPC Standard 10 and SAC tenant 2022.2.7 (us10) in the landscape.
Implementing use cases for OPEX Planning in SAC Planning on top of BPC Standard model.
While using Acquired Data Connection (with OR without writeback option) , I am able to see data imported and loaded in SAC Planning model.
However, the data is not retrieved in Story, error on Account dimension is "Maximum call stack size exceeded".
See attached screen pictures:
sap-bpc-acquired-connection.png
I want to use Acquired Data Connection to allow planner to input master data elements, manage security of Controller and Planner using DAC, allow Controller to create own Forecast versions in SAC, analyze Delta of Actuals, Budget, Forecast and Rolling Forecast etc.
Fetching smaller chunks of data from BPC by applying filters on Account, Time and Category did not help.
Please advise if there is any configuration, heap size etc. that I am missing in SAC.
Thanks,
Prathamesh Acharya