Hi All
Inspection Type: 01, when doing GR for the PO the quantity is splitted and taken in different location. The Batch and PO and material & GRN is same. Only the location is different. In this case, one inspection lot needs to be created. But in SAP, its creating so many lots based on the split quantity in the line item (Storage loc). How we can make the system to create one lot for taking GR at different locations. I have checked 'Control Lot Creation'. It doesn't fulfill my scenario. Kindly help.
Regards,
Vignesh