hello,
There is a job chain with 3 steps in Quality system.
Is it possible to change Step 2 in QE1-300 using redwood .
below is the requirement :
I want the same Program: ZP2SEN634_PEGGING / variant: LATROBE_PEG_F
Program: ZP2SEN634_PEGGING / variant: LATROBE_PEG_S
To run in parallel and both must finish prior to starting Step 3.