cancel
Showing results for 
Search instead for 
Did you mean: 

Alternate perform to update XVBKD in VA02

former_member625937
Participant
0 Kudos

Hi Team,

I have a below scenario in Sale order Change and request to guide me on the same.

1. User has provided the Sale order no in va02

2. User has changed the plant in the Item level and removed the material and gave Enter.

3. Then, Exit program of ZZ45A13 is been called, where it calls the attached Standard perform

4. As the Standard perform called and as per standard it does below operation and goes for the Dump as(Duplicate Entries are found)

Operations and Filling of XVBKD Structure-

1. When user removes the Material and change the plant

eg-

- UPDKZ || VBELN || POSNR

- D || 1001 || 10

2. After the plant change and material removal, redetermination happens and manipualte the New material then in that case as below

eq-

- UPDKZ || VBELN || POSNR

- I || 1001 || 10

Note - As two entries are filled and VBELN,POSNR is key parameter...it goes for the Duplicate Error.Kindly suggest on the same , how to overcome this.Is there any alternate Standard perform to use the same .

Accepted Solutions (0)

Answers (0)