Hello everybody,
We would like to know is it possible that SAP consider the batch information to determine alternative material.
For example, there are two material A and B in the same alternative group in BOM.
SAP choose the A if the its possibility is 100% as the strategy set to 2.
But if one batch of material B had earlier Expiration Date, how can I let SAP choose material B.
Any info will be greatly appreciated.