cancel
Showing results for 
Search instead for 
Did you mean: 

Copy Requirement Urgency from PR to PO

isunsai
Member
0 Kudos

We have a requirement to copy Requirement Urgency assigned in PR to PO. I checked in config and could not find any way to do the same.

Is enhancement only way to do this or is there a standard way to do the same?

Accepted Solutions (0)

Answers (0)