on 12-05-2021 3:28 PM
Hi
i have a problem in my scenario after GR inbound delivery.
in my scenario i have a po that GR with mvt 107 and 109. first GR in plant level(GR valuated Block Stock(107)) has been done in system with vl06i tcode, now i want to GR 109 (Release GR Block Stock) but I didnt mentioned sloc in my inbound delivery while i was doing 107 and it posted ok. and now i want to do GR 109 but i cant ، because the inbound delivery sloc should be exact the same sloc mentioned in migo while doing 109. and now system doesnt allow me to change my inbound delivery.
my error:
Message no. VLA316
The specified storage location does not match the one defined in the inbound delivery. This could lead to an inconsistency between the material document and the inbound delivery.
i know i can change the erorr message to warning but i dont want to change the standar behavior.
any idea how to solve the problem ?
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.