Skip to Content
0
Oct 01, 2021 at 03:00 PM

Routing Component Allocation from 2nd level BOM - Reg

735 Views

Hi Gurus,

I'm trying to assign a component (From 2nd Level BOM) to ROUTING Operation number through BAPI_ROUTING_CREATE but couldn't be successful. I was able to assign 1st level components but not the 2nd level. I gave the BOM Number and other details similar to 1st level assignment but still the component allocation is unsuccessful. Kindly help me with the required details and it would be of great help

Best Regards

SenthilNathan Karunanithi