Calibration of test equipment

Former Member
0 Kudos

We need to record the Material with Batch and Expiry date as calibration standard used for the calibration, we want to assigned a material PRT batch as a master in the task list. but when we go to assign material PRT in the Task list , there is not field for the Batch.

Pl suggest me how we can overcome with this Issue.

Thanks in advance.